SLC Square Installation Guide
How to Assemble
-
Ensure the subfloor or existing flooring is completely clean and level. -
Install the first tile, making sure it sits perfectly square with the adjacent walls. -
-
- Continue installing, interlocking the tiles to the right until the row is complete.
-
-
- Once the first row is complete, start the next row from the beginning, checking constantly to ensure the tiles remain perfectly square.
-
Measure and cut the perimeter tiles to size as needed. -
Tiles can be cut cleanly using a standard tile cutter or an angle grinder. -
Trim the polyurethane (PUR) backing easily using a jigsaw equipped with a laminate blade. -
Fill any remaining expansion gaps between the perimeter tiles and the wall with silicone caulk. -
-
SLC Square tiles are incredibly easy to replace. Whether you are changing the layout or replacing a damaged piece, individual modules or entire sections can be removed effortlessly using the specialized removal tool. Best of all, spot replacements can be done during regular business hours with zero downtime, closures, or disruptions.